Our work, with the reasoning attached.
White papers and technical documentation. The research behind the product: what the rural coverage gap costs today, why the economics of the last sites fail, and what changes when energy stops being the deciding constraint.
White papers
Closing the Rural Connectivity Gap with Energy-Efficient Mobile Infrastructure
Sub-Saharan Africa needs more than 269,000 additional rural towers to close its coverage gap, and the reason they haven't been built is power, not demand or spectrum. What the site economics look like when energy stops being the deciding constraint.
Financing the Unviable Site
The coverage gap is a capital-allocation problem: nobody in the traditional value chain is structured to underwrite the marginal site. A model for funding, building, and owning rural networks where the site pays for itself.
Technical documentation
Smart Network Tower Radio — data sheet
Bands, configurations, standards, environmental ratings, interfaces, and deployment profile.